Rapidstrike III

Rapidstrike III
101st Divisions Operations to Reclaim the Area K14

Monday, 25 July 2016

03/13/1969 Orders 1/501st Inf Abn

CLASSIFIED
YOK NAM LOA MASSIF AREA
From: S3 Ops 1/501st Inf
To:. TOC FSB, Bravo & Delta 1/501st

Operation RAPIDSTRIKE III -
DATE/TIME: 03/12/1969
Orders for 03/13/1969

Weather
Patchy rain nearby
Max:       34°c | Min: 19°c
Rain:     15.70 mm
Sunrise: 05:29 AM
Sunset:   06:04 PM
Cloud      15%  - 100%             
Wind       2-4mph primarily from S.
Humidity  49% - 98%   
Pressure   1008mb - 1010 mb      

Bravo –
3rd Platoon to move to area due West of 218 597 and set up ambush positions for night – radio in only hourly with sitrep unless full engagement occurs

1st & 2nd Platoons prepare and remain on alert for assistance action to Bravo 3rd Plt

Maintain use of Hill 524 as OP

Delta –
2nd Platoon to provide Point with flanking security from 3rd Platoon (left) and 1st Platoon (right) ,  Wpns Plt and HQ to be rear of Platoon Diamond formation and conduct aggressive patrol North West of FSB perimeter for up to 4KM  - Duration 8hrs plus 1 x 30 min stop – Area to be patrolled GR 211 621 to GR 201629 search and destroy any enemy encountered. Report in any obvious trails/signs of the enemy and utilise A Battery as Fire Support if required.


326th Engrs - to continue FSB Lee construction – advise on insertion of Artillery Batteries and Support Units

A 2/319 Arty – Continue to improve firing positions and to provided fire support as necessary

Charlie & Alpha Companies -
Confirm readiness to enter the AO.

Cyclone 6 Actual FSB LEE CP

Supply confirmation that all villagers are evac’d and we can now begin Operations in earnest

Cyclone 6 Actual Out

 LtC P D Lewis

          EYES ONLY