CLASSIFIED
YOK NAM LOA MASSIF AREA
From:
TOC FSB LEE
To:.
(S3) Operations 1/501st, Cyclone 6
Actual
Operation
RAPIDSTRIKE III -
DATE/TIME: 03/10/1969
Night
09-10 Passed quietly
Bravo –
Ordered
Platoons to patrol W. of FSB LEE as security screen during insertion of A 2/319th
Arty
1st Plt to 210 630 & RTB
2nd Plt to 210 615 & RTB
3rd Plt to 220 600 found tracks
of 30+ individuals then lost, RTB
LP’s
GR 235605 & 235 625 set and Radio check made 1600
Delta –
Assigned
FSB Security and assist construction and “A Battery” 2/319signed Deployment
1/B/326th Engr Construction continues,
Fire control center and artillery firing positions set and prep begun awaiting
arrival of artillery tomorrow
Bravo 2/17th Cav
Send
Out Platoon strength Route patrols to maintain route security and to provided
screen while Artillery inserted
1st Plt Patrol Route 344 North
to its end 182 678 RTB
2nd Plt Patrol trail West until
marshy ground stopped progress at 195 622 RTB
3rd Plt Patrol Route 344 South
to B. Dring Deung 245 576 On approaching Ville spotted group of 10 (?) VC
Fleeing South, opened fire on them and dismounts went in pursuit but lost them
and decided to call back. RTB
“A Battery” 2/319
Day
Spent inserting in to FSB. Lead team located positions for FDC and firing positions,
Engineers begin building Blasting ground for FDC and Firing positions. 105s
brought in. 1800 All guns and Btty personnel on ground and gun ready to receive
Fire Missions
EYES ONLY
No comments:
Post a Comment